About the Degradation Sensitivity
Degradation sensitivity analysis tests how sensitive a solar project's IRR and lifetime yield are to different panel degradation rate assumptions — since the degradation rate is one of the key uncertainties in long-term financial models and small differences compound significantly over 25 years.
How to calculate it
- 1Build a base-case yield model: Year-1 generation × (1 − d₁) × (1 − dₙ)ᵗ for each year.
- 2Vary dₙ across the plausible range: low (0.3%/year — top-tier HJT/bifacial), base (0.5%/year — standard monocrystalline), high (0.7%/year — older PERC, harsh climate).
- 3Calculate cumulative generation and revenue for each scenario over 25 years.
- 4Calculate the delta: a 0.2%/year change in degradation rate over 25 years changes cumulative yield by approximately 3–4% — significant at the scale of a large plant.
- 5Convert yield change to revenue impact and IRR sensitivity.
Worked example
A 1 MWp plant generating 15 L kWh in Year 1. Over 25 years: at 0.3%/year degradation, cumulative generation = 3.26 Cr kWh; at 0.5%/year = 3.18 Cr kWh; at 0.7%/year = 3.09 Cr kWh. Revenue difference between 0.3% and 0.7%/year at ₹3.5/kWh PPA = ₹59 L over 25 years — meaningful for an ₹3.5 Cr project. IRR impact: approximately 0.5–0.8 percentage points.
What you can calculate
- Sensitivity table
- LCOS impact
- Revenue delta
- Scenario compare
Frequently asked questions
Which solar panels have the lowest degradation rates?
HJT (heterojunction) panels from major manufacturers typically guarantee 0.25–0.3%/year degradation — the lowest in the industry. TOPCon panels come in at 0.35–0.40%/year. Standard PERC monocrystalline: 0.45–0.55%/year. Polycrystalline: 0.5–0.7%/year. For long-duration projects (25+ years), HJT's lower degradation often justifies its ₹3–5/Wp premium over PERC in a full LCOE comparison.
Should I use P50 or P90 degradation in my financial model?
Use P50 degradation (best-estimate from the manufacturer's historical data) for the equity return model and P90 degradation (conservative) for the lender's debt service analysis. Some lenders require a degradation warranty from the module manufacturer or an independent technical advisor's degradation report before accepting P50 assumptions in the base case.
Ready to build your solar project?
Get free quotes from verified EPCs and installers across India.
You might also need
Power Rating
Size BESS power output in kW/MW for peak shaving, backup, or grid services based on C-rate and capacity
OpenEnergy-to-Power Ratio
Determine optimal E/P ratio for use-case (1C backup, 0.25C arbitrage, 2C frequency regulation)
OpenAutonomy / Backup Time
Calculate backup duration from capacity, load, and DoD — validate against IS 16270 backup requirements
OpenRound-Trip Efficiency
Compute RTE from charge/discharge efficiency and auxiliary losses — benchmark vs IEC 62933 ≥85%
OpenDC/AC Architecture
Compare DC-coupled vs AC-coupled BESS architecture for efficiency, cost, and application suitability
OpenHybrid Solar + BESS
Size combined solar PV + BESS system for self-consumption, peak shaving, and grid export optimization
Open