Apply for the PM Surya Ghar Muft Bijli Yojana in Rajasthan — up to ₹78,000 central subsidy plus a state top-up, credited directly to your bank account after installation.
Rajasthan receives an estimated 1,650 kWh/kW/year of solar yield. A 3 kW system covers roughly 5000 kWh/year — saving around ₹34,700 annually at ₹7/kWh. See full economics →
₹78,000
Max CFA subsidy
1,650
kWh / kW / year (est.)
0/—
Net-metering DISCOMs
0
Listed installers
Launched in February 2024, PM Surya Ghar: Muft Bijli Yojana targets 1 crore Indian households with free rooftop solar power. Residents of Rajasthan can claim the Central Financial Assistance (CFA) of ₹30,000/kW for systems up to 2 kW, ₹18,000/kW for the 2–3 kW slab, capped at ₹78,000 for 3 kW and above. The subsidy is transferred directly to your bank account after the DISCOM commissions the plant.
| System size | CFA subsidy | Est. net cost* | Payback (est.) |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹13,000 | 1.1 yrs |
| 2 kW | ₹60,000 | ₹43,000 | 1.9 yrs |
| 3 kW | ₹78,000 | ₹85,000 | 2.5 yrs |
| 5 kW | ₹78,000 | ₹2.05 L | 3.5 yrs |
*Based on ₹60,000/kW turnkey cost, 1,650 kWh/kW/year in Rajasthan, and ₹7/kWh tariff. Full savings breakdown →
Register on the PM Surya Ghar portal
Visit pmsuryaghar.gov.in and register using your Rajasthan electricity consumer number and your Aadhaar-linked mobile number. You will receive an OTP to verify and create your account.
Apply through your Rajasthan DISCOM
After registration, select your DISCOM from the portal and submit a rooftop solar application. The DISCOM will assess technical feasibility — capacity, roof load, metering setup — and issue approval (typically within 15 days).
Select an ALMM-approved vendor
Choose a SolarPanti-listed registered installer who supplies ALMM-approved solar modules and inverters. The subsidy is only available for equipment on the MNRE Approved List. Get at least two quotes and verify the vendor's MNRE registration.
Install the rooftop system
The vendor installs the solar panels, inverter, and mounting structure. Ensure they also apply for net metering — the bi-directional meter that lets you export surplus power to the grid and offset it on your bill.
Commissioning and net metering inspection
After installation, your Rajasthan DISCOM will schedule an inspection, commission the plant, and replace or reprogram your existing meter with a net meter. You will receive a plant commissioning certificate on successful inspection.
Submit details and receive subsidy
Log in to the PM Surya Ghar portal, upload the commissioning certificate, and enter your bank account details. The Central Financial Assistance is credited directly to your bank account (via DBT) within 30 days of verification.
Your PM Surya Ghar application is processed through your local DISCOM. Rajasthan has distribution companies — select the correct one on the portal for faster processing.
DISCOM data for Rajasthan is being expanded. See the full DISCOM directory.
Hyperlocal solar costs, DISCOM details, and installer listings for cities in Rajasthan:
Register at pmsuryaghar.gov.in with your Rajasthan electricity account details and Aadhaar-linked mobile. Select your DISCOM, submit the application for feasibility approval, then get an ALMM-approved system installed by a registered vendor. After commissioning and net metering, upload your bank details to receive the subsidy directly.
In Rajasthan, the Central Financial Assistance is ₹30,000 per kW up to 2 kW, plus ₹18,000 for the 3rd kW — capped at ₹78,000 for 3 kW and above. Rajasthan also offers a state top-up: ₹17,000 flat (Only for households registered in the 150-unit free electricity scheme (min 1.1 kW)).
The end-to-end process — portal registration, DISCOM approval, installation, commissioning, and subsidy credit — typically takes 4–8 weeks in most states. DISCOM response time varies; Rajasthan has several distribution companies you apply through.
At an indicative cost of ₹60,000/kW, a 3 kW system costs about ₹1,80,000 before subsidy. After ₹95,000 of subsidy, your net outlay is roughly ₹85,000. The system should generate around 4,950 kWh/year in Rajasthan, saving approximately ₹34,650 annually — a payback of about 2.5 years.
Yes. Only systems using modules and inverters on the MNRE Approved List of Models and Manufacturers (ALMM) qualify for the PM Surya Ghar subsidy. SolarPanti's listed vendors supply ALMM-approved equipment. Check the ALMM list on the MNRE portal before signing any contract.
Residents of group housing societies (GHSs) in Rajasthan can apply collectively through the society, or individually for their unit subject to DISCOM feasibility. For individual applicants in GHSs, the feasibility approval depends on the building's common metering setup — confirm with your Rajasthan DISCOM before proceeding.
Looking for the full subsidy economics for Rajasthan?
Our Solar Subsidy in Rajasthan page shows the complete savings table — net cost, annual generation, annual savings, and payback for 1–5 kW systems — plus net-metering DISCOM status.